TENORM


All posts for TENORM

Effective Management of NORM during a Plant Shutdown in 2020 and 2021

In 2020, many Oil and Gas producers have had little choice but to postpone essential maintenance turnarounds due to the COVID-19 pandemic. As a result, 2021 is poised to be one of the busiest years for plant turnarounds. Planners will be faced with the ominous task of executing extensive turnaround ...

Callum Grieves


  England   GB 18 Nov 2020


Posted 1 month agoEvent > NORMTENORMRadiation Monitoring +2

Radiation surveys for the identification and monitoring of NORM

Naturally Occurring Radioactive Material (NORM) is commonly found in the seabed rock formations and in #oil wells. Due to the extraction process, this radioactive material is carried along with produced oil and water and often accumulates on oil and gas assets such as pipes, separators, filters and ...

Callum Grieves


  England   GB 22 Sep 2020


Posted 3 months agoEvent > NORMTENORMRadiation Monitoring +3

Decommissioning and the Transportation of NORM and TENORM

Underestimating the time and resource required to correctly transport NORM (Naturally Occurring Radioactive Material) or TENORM (Technologically Enhanced Naturally Occurring Radioactive Material) during decommissioning could prove to be costly, not least because it is likely to cause delays in shipp ...

Callum Grieves


Posted 2 years agoOpinion > Decommissioningoffshore decommissioningTENORM +4

Decommissioning - To End or Extend?

The challenging conditions faced in today's oil and gas market has increased the focus on cost effective, sustainable operations. Operators are faced with the decision of extending or ending offshore production asset life and pre-decommissioning planning has emerged as a key challenge for the indust ...

Callum Grieves


Posted 2 years agoOpinion > Decommissioningoffshore decommissioningReservoir Characterisation +2

7th Annual Cost-Effective Produced Water Management Marcellus & Utica 2017

Marcellus and Utica Natural Gas production is defying the sceptics and rigs are firing up once again. However, the regulatory landscape is changing dramatically with the newly legislated Chapter 78a forcing operators to rethink their water management plans, and increasing concerns around TENORM and ...

Louise Gosling


    29 Mar 2017


Posted 3 years agoEvent > Water ManagementMarcellusUtica +6