Norway


All posts for Norway

NPD: Dry Well Near the Njord Field in the Norwegian Sea - 6407/11-1

Equinor Energy AS, operator of production licence 751, is in the process of concluding the drilling of wildcat well 6407/11-1. The well is dry. The well has been drilled about 15 kilometres southeast of the Njord field and 120 kilometres north of Kristiansund. The primary exploration target for ...

OilVoice Press - OilVoice


Posted 22 hours agoPress > EquinorEquinor EnergyDry Well +7

Shell’s Sale of Draugen and Gjøa Fields a Sign of Shifting Times in the Region, says GlobalData

Following the news (Friday 30 November) of Royal Dutch Shell subsidiary A/S Norske Shell completing a deal to exit its operated interest (44.56%) in the Draugen oil field and its non-operated interest (12%) in the Gjøa gas field, offshore Norway, further signifies portfolio rebalancing and divestme ...

OilVoice Press - OilVoice


Posted 8 days agoOpinion > ShellRoyal Dutch ShellDraugen +7

NPD: Drilling Permit for Well 24/9-14 S in Production Licence 869

The Norwegian Petroleum Directorate has granted Aker BP ASA a drilling permit for well 24/9-14 S, cf. Section 15 of the Resource Management Regulations.   The well will be drilled from the Scarabeo 8 drilling facility in position 59°21'51.91" north and 1°46'52.29" east after completing drillin ...

OilVoice Press - OilVoice


Posted 9 days agoPress > DrillingNorwayOffshore +5

NPD - Gas Discovery Northwest of Gas Discovery 7325/1-1 (Atlantis) in the Barents Sea – 7324/3-1

Equinor Energy AS, operator of production licence 615, has completed the drilling of wildcat well 7324/3-1. The well was drilled about 15 kilometres northwest of discovery well 7325/1-1 (Atlantis) and 370 kilometres north of Hammerfest. The well's primary exploration target was to prove oil in r ...

OilVoice Press - OilVoice


Posted 13 days agoPress > EquinorEquinor EnergyNPD +7

NPPD: Minor Gas/Condensate Discovery North of the Oseberg Field in the North Sea - 30/6-30

Faroe Petroleum Norge AS, operator of production licence 825, is in the process of concluding the drilling of wildcat well 30/6-30. The well was drilled about 25 kilometres north of the Oseberg field centre in the northern part of the North Sea, and 150 kilometres northwest of Bergen. The primar ...

OilVoice Press - OilVoice


Posted 13 days agoPress > NPDNorwegian Petroleum DirectorateNorway +5

Equinor: Johan Castberg Construction Begins at Stord

Norwegian minister of petroleum and energy, Kjell-Børge Freiberg, will today start cutting the first sheet for the topside of the Johan Castberg vessel at Kværner's yard at Stord. The construction will create major ripple effects throughout Norway. "Johan Castberg is the next major de ...

OilVoice Press - OilVoice


Posted 13 days agoPress > EquinorEquinor EnergyJohan Castberg +3

NPD: Drilling Permit for Well 7121/1-2 S in Production Licence 767

The Norwegian Petroleum Directorate has granted Lundin Norway AS a drilling permit for well 7121/1-2 S, cf. Section 15 of the Resource Management Regulations. Well 7121/1-2 S will be drilled from the Leiv Eiriksson drilling facility in position 71°47'38.40" North and 21°07'30.53" East. The dri ...

OilVoice Press - OilVoice


Posted 14 days agoPress > NPDNorwayNorwegian Petroleum Directorate +6

NPD: Drilling Permit for Well 6406/6-6 A in Production Licence 255 B

The Norwegian Petroleum Directorate has granted Total E&P Norge AS a drilling permit for well 6406/6-6 A, cf. Section 15 of the Resource Management Regulations. Well 6406/6-6 A will be drilled from the Scarabeo 8 drilling facility in position 64°35'47.61" North and 6°51'15.40" East after comple ...

OilVoice Press - OilVoice


Posted 14 days agoPress > NPDNorwayNorwegian Petroleum Directorate +7

NPD: Drilling Permit for Well 7122/7-7 S in Production Licence 229

The Norwegian Petroleum Directorate has granted Eni Norge AS a drilling permit for well 7122/7-7 S, cf. section 15 of the Resource Management Regulations. Well 7122/7-7 S will be drilled from the West Hercules drilling facility in position 71°17'33.53" North and 22°15'14.46" East after concludi ...

OilVoice Press - OilVoice


Posted 20 days agoPress > NPDNorwayNorwegian Petroleum Directorate +6

NPD: Production Figures October 2018

Preliminary production figures for October 2018 show an average daily production of 1 874 000 barrels of oil, NGL and condensate, which is an increase of 271 000 barrels per day compared to September. Total gas sales were 10.6 billion Sm 3 (GSm 3 ), which is an increase of 1.6 GSM 3 from the pr ...

OilVoice Press - OilVoice


Posted 22 days agoPress > NPDProduction FiguresProduction +2

Cairn Energy PLC - North Sea Operational Update

UK Norway Update - discovery and farm out Cairn announces the following; An oil discovery on the 9/14a-17B well and associated side-track on the Agar-Plantain Prospect in the UK North Sea Farm out agreement for a 40% non-operated interest of the Chimera prospect in the UK North Sea Commitmen ...

OilVoice Press - OilVoice


Posted 25 days agoPress > Cairn EnergyNorwayUnited Kingdom +7

NPD: Drilling Permit for Well 8/10-7 S in Production Licence 405

The Norwegian Petroleum Directorate has granted Spirit Energy Norge AS a drilling permit for well 8/10-7 S, cf. Section 15 of the Resource Management Regulations. Well 8/10-7 S will be drilled from the Maersk Interceptor drilling facility in position 57°6'54.81" north and 3°3'31.5" east. The d ...

OilVoice Press - OilVoice


Posted 29 days agoPress > NPDNorwegian Petroleum DirectorateDrilling +8

TGS Announces Strategic Collaboration for Ocean Bottom Node Projects in North Sea

TGS announces a strategic collaboration with Axxis Geo Solutions (AGS) for multi-client ocean bottom node projects in the North Sea.   The area of mutual interest covers the core part of the central North Sea up to and including the Utsira area.   Under this agreement, the parties will work to ...

OilVoice Press - OilVoice


Posted 29 days agoPress > TGSNorwayNorth Sea +3

Equinor Energy: Operations Resumed at Sture and Kollsnes After Shut-Down

The Sture terminal north-west of Bergen. (Photo: Helge Hansen / Equinor ASA) The Sture terminal  and the Kollsnes plant resumed operations Thursday afternoon after being shut down in connection with the collision between the frigate KNM Helge Ingstad and the tanker Sola TS at the Sture ...

OilVoice Press - OilVoice


Posted 1 month agoPress > Equinor EnergyEquinorSture +4

Equinor: Shutting Down the Sture Terminal

The Sture terminal north-west of Bergen. (Photo: Helge Hansen / Equinor ASA) In connection with the collision between the frigate Helge Ingstad and the tanker TS Sola at the Sture terminal in Øygarden Equinor will gradually shut down operations at Sture. Personnel at Sture without ...

OilVoice Press - OilVoice


Posted 1 month agoPress > EquinorEqunior EnergySture Terminal +2