Inspection Process


All posts for Inspection Process

ASTM A53 ERW Steel Pipe Inspection Process

The details of A53 ERW pipe evaluation process: 1. Non-destructive testing Rotate the detection arm of the inspection station into the straight seam welded pipe productionline, observe the position of the weld through the camera, adjust the front and rear position ofthe probe with the operating le ...

lvy lee - Permanent Steel Manufacturing Co.,Ltd


Posted 1 month agoPress > ASTM A53erw steel pipeInspection Process