Press

BP's Rumaila oilfield achieves 3 billion barrel production landmark


  • Production increased by more than 40% since BP joined partnership to redevelop Rumaila oilfield in 2010
  • Oil production rate highest in 27 years
  • Around $200 billion generated for the Iraqi economy
  • Production boosted by new technologies, refurbishment of existing assets and one of the largest water injection programmes ever undertaken
The Rumaila Operating Organisation (ROO), composed of BP, PetroChina and the South Oil Company of Iraq, today announced that the Rumaila oilfield has produced three billion barrels of oil since the joint venture began operating in January 2010.
During the past six years the oil produced from Rumaila has provided the Iraqi state with an estimated $200 billion dollars in revenue.

Oil production at Rumaila is now at its highest rate in 27 years, producing over 1.45 million barrels per day (bpd), up from 1 million in 2009.

The production increase was achieved despite challenging geological conditions and aging infrastructure and equipment within 40-year-old field. Addressing these issues has seen the ROO partnership develop a performance-led culture, empowering the local Iraqi workforce to deploy new and more advanced technologies.

Iraq's Minister of Oil, Jabar Ali al-Luaibi, commented: “Producing 3 billion barrels in such a short period of time is an impressive achievement. Rumaila is a crucial oil field and we look to our international partners and Iraqi colleagues to continue to increase production from the field in the years to come.”

Bernard Looney, BP's chief executive of Upstream, commented: “Achieving 3 billion barrels of oil in less than seven years is a fantastic achievement, especially when you consider the challenges the oil and gas industry has faced globally during the past two years. Despite this challenging environment the BP team, working shoulder-to-shoulder with our colleagues at PetroChina and SOC, safely delivered increased production and important oil revenues for Iraq.”

Under ROO's management, the number of producing wells at Rumaila has risen by about 50%, with more than 240 new wells drilled and an ongoing well workover programme implemented to counter the natural rate of decline of the mature field. Cutting edge technologies such as ‘real-time' well logs, advanced core sample analysis and 3D subsurface maps have improved well performance, drilling accuracy and efficiency.


In addition to the active drilling programme, one of the world's largest water injection projects was completed to boost output in areas where reservoir pressure had fallen after half a century of production. Between March 2013 and October 2016, water injection increased from 60,000 to 900,000 barrels per day following renovation of the Qarmat Ali water treatment plant, five pumping stations and associated pipelines.

The refurbishment of other facilities also continues across the field. Rumaila's degassing stations now treat around 1.8 million barrels per day of oil and produced water - volumes of fluids not seen since 1979. Investment in new oil, gas and water separation units, dehydrators and desalters, and produced water disposal units are proving vital in helping to sustain facilities, many of which date back to the 1970s.

In tandem with production achievements, safety performance at Rumaila has been significantly improved. Compulsory personal protective equipment standards, control of work safety procedures, 24-hour ambulance service and four new fully-equipped medical clinics have all been established. Additionally, hundreds of thousands of hours of safety training have also been undertaken to significantly reduce accidents and to provide a world-class emergency response in the event of any safety-related incidents.

BP is the top international oil company investor in the Middle East and North Africa. Together with its national oil company partners, BP is currently managing approximately 3 million barrels per day of oil and gas production in the Middle East..


Visit source site

bp.com/en/global/corporate/press/press-releases/ru...

BPIraqRumaila

More items from oilvoice


88 Energy - Icewine#2 Operations Update

88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska. Highlights Stage 2 stimulation operations completed successfully Icewine#2 Operations Update  Both stages of the planned tw ...

OilVoice Press


Posted 4 days agoPress > 88 EnergyProject IcewineAIM +1

Cairn secures new licences in Mexico bid round

  Cairn is pleased to announce it has secured interests in two licences in the Mexico offshore bid round. The licences (one operated and one non-operated, covering ~1,100km2) are located in the Gulf of Mexico in the shallow water Sureste basin in water depths of 100-500metres and ~50km offshore:  ...

OilVoice Press


Posted 4 days agoPress > Cairn EnergyMexicoGulf Of Mexico

Clontarf Energy - Award of Offshore Acreage in Equatorial Guinea

  The directors of Clontarf Energy (AIM: CLON) are pleased to announce that Clontarf Energy has been awarded Block 18 (EG-18) in the Equatorial Guinea 2017 Bid Round.  Block 18 covers approximately 5,056 km2 of undrilled deep water acreage with several play types.  Clontarf Energy's focus will be ...

OilVoice Press


Posted 18 days agoPress > Clontarf EnergyEquatorial Guineaawards

88 Energy - Icewine#2 Operations Update

  88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska. Highlights Arctic Fox rig demobilisation complete Log interpretation for finalisation of stimulation deisgn completed Sun ...

OilVoice Press


Posted 18 days agoPress > 88 EnergyProject IcewineAlaska

Zenith - Success of sidetrack operations at well M-195

Zenith Energy Ltd. (LSE: ZEN; TSX.V: ZEE), the dual listed international oil & gas production company, is pleased to announce successful drilling to a depth of 3,050 meters at well M-195. A Neutron Log has subsequently been run which has confirmed a net oil payzone of 8 metres. Initial flow rates o ...

OilVoice Press


Posted 19 days agoPress > Zenith Energy
All posts from oilvoice