Posted by Andrew Mosley - AS Mosley.com
27-Jun-2018
Analysis engineering firm, AS Mosley, has secured a five-year framework global agreement with oil major BP to undertake Global Riser Analysis projects at an international level.
The new contract has given the firm confidence to grow, as it kicks off a recruitment drive to take on and train up more Analysis Engineers in Aberdeen. AS Mosley has been working with BP in the UK for the last 20 years, carrying out Global Riser Analysis work for the oil company in the North Sea and West of Shetland.
Andrew Mosley, Director at AS Mosley comments: “This is good news for us and its good news for Aberdeen. It gives us confidence to grow. Training graduates in Analysis Engineering can take at least two years, so we need to be sure to have enough work to support any expansion. This, along with other new projects that have been secured over the last few months, gives us the cushion we need to strengthen our team. We are looking to take on two Engineers as well as a Graduate Engineer over the next three months and hope to take on more over the coming year.”
AS Mosley was established in 1997. The firm specialises in the design and analysis of riser systems, subsea equipment and platform conductors. It works globally from its base in Aberdeenshire, carrying out specialist analysis and consultancy for existing equipment and new innovations.
For more information on AS Mosley visit www.asmosley.com.
Visit source site
asmosley.com/news/2018/as-mosley-secures-5-year-co...
North Seaglobal riser analysisengineering analysisBPAS Mosley
Are Women Equally Represented in the Engineering Sector?
stephen avv
Rule of Thirds: Breaking It Down in the Midstream
Doug Sheridan
How changes to the oil industry impact the construction industry
stephen avv
Discussing the future of EAM – Progressive TSL’s highlights from the Infor EAM UK&I Summit
Louise Rock-West
Reducing Human Error in Construction and Engineering
stephen avv
Field Service Technician - Orange
Orange New South Wales AU
Field Service Technician
Cobar New South Wales AU
12 Designer
Brisbane Queensland AU
Estimator
Macarthur Australian Capital Territory AU
Fitter
Cabramatta New South Wales AU
Progressive TSL profiles: Jon Barker
Progressive TSL
Tendeka launches one-trip remedial system to mitigate sand control failure in wells
Annealing Process of Seamless Steel Pipe
Permanent Steel Manufacturing Co.,Ltd
AISUS Forms Strategic Partnership With Petrotec In Qatar
Valor Energy Group