Press

Victoria Oil and Gas: Batch Drilling of Two Wells Underway, Cameroon

Posted by Katie Woodward - OilVoice

28-Nov-2016


Gaz du Cameroun S.A. (GDC), the Company's Cameroon gas producing and distributing subsidiary, announces that following spudding of well La-107 on November 1 2016, it has successfully drilled, cased and cemented the uppermost, 18⅝” section of the well to a depth of 400 metres. Operations on La-107 were then suspended as planned and the rig was skidded a distance of 10 metres along the rail system to the La-108 well location. The 1500 HP Komako 1 drilling rig, owned and operated by Savannah Oil Services Cameroon S.A., is a rail-mounted drilling rig and can skid between the two wells in a matter of hours.

Well La-108 was spudded on the 12th November 2016 and has been drilled and cased to a depth of 400 metres. Currently, Savannah is drilling the 17½” hole section on La-108, after which the rig will be skidded back to the La-107 well to drill its 17½” hole section.

The gas bearing target horizons, from which it is anticipated both new wells will produce, are in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 1,700m and 3,200m below the surface.

Rig Skidding and Batch Drilling

The 2016/17 drilling campaign at Logbaba is designed as a ‘batch drilling' operation. As a well is drilled, the equipment, drilling fluids, drilling services and specialist personnel required vary for each hole section. In a batch drilling operation, the rig is moved back and forth between the wells, progressing through all the hole sections until the wells have reached target depth. The Komako 1 rail mounted drilling rig is designed for this type of operation.

Significant cost saving and efficiencies are realised from a batch drilling programme, as materials and services are mobilised to the site, employed on both wells for each hole section and then demobilised when no longer required. In a conventional back-to-back two well drilling campaign the equipment and materials are all mobilised as required for the first well and then all equipment remains on standby rental until it is required again on the second well, three or four months later. With batch drilling the Company avoids having significant amounts of equipment and services on standby for 3 or 4 months between wells.



New service from OilVoice
Trip Shepherd is for companies who need to track their staff in areas of risk.
It's free to use, so we invite you to try it.

Victoria Oil & Gas

More items from katie


Shell announces appointment of new Company Secretary

Royal Dutch Shell plc announces the appointment of Linda Szymanski as Company Secretary with effect from January 1, 2017. Ms Szymanski succeeds Michiel Brandjes who retires at the end of the year after 36 years of service with the Shell group, of which 13 years was as General Counsel Corporate and C ...

Katie Woodward - OilVoice


Posted 2 years agoPress > ShellPeople on the MoveCompany Secretary

Spartan Energy Corp. Announces Closing of Previously Announced Strategic Light Oil Acquisition, 2017 Corporate Budget and Increase in Borrowing Base to $350 Million

CALGARY, ALBERTA--(Marketwired - Dec. 8, 2016) - Spartan Energy Corp. ("Spartan" or the "Company") (TSX:SPE) is pleased to announce the closing of its previously announced strategic light oil acquisition in southeast Saskatchewan from ARC Resources Ltd. (the "Acquisition"). The Acquisition includes ...

Katie Woodward - OilVoice


Posted 2 years agoPress > Spartan Energy CorpAcquisition2017 +2

ARC Resources Ltd. Closes Sale of Saskatchewan Assets

CALGARY, Dec. 8, 2016 /CNW/ - (ARX – TSX) ARC Resources Ltd. is pleased to announce that it has successfully closed the previously-announced sale of its Saskatchewan assets and operations to Spartan Energy Corp. (SPE – TSX), for total cash consideration of $700 million, subject to customary post-clo ...

Katie Woodward - OilVoice


Posted 2 years agoPress > ARC ResourcesSaskatchewanAssets +2

Perpetual Energy announces 2017 capital spending and production guidance

CALGARY, Dec. 8, 2016 /CNW/ - Perpetual Energy Inc. ("Perpetual", the "Company" or the "Corporation") (TSX:PMT) is pleased to announce its capital spending plans and expected production growth for 2017. Perpetual's success in advancing its strategic priorities in 2016, coupled with strengthening co ...

Katie Woodward - OilVoice


Posted 2 years agoPress > Perpetual Energy2017CAPEX +1

First LNG produced from PETRONAS' first floating LNG facility PFLNG Satu

PETRONAS' first floating liquefied natural gas (LNG) facility, PFLNG SATU has achieved an industry breakthrough with the successful production of its first drop of LNG from the Kanowit gas field, offshore Sarawak on 5 December 2016. The operational milestone marks a decade long journey for PETRONAS ...

Katie Woodward - OilVoice


Posted 2 years agoPress > PETRONASLNGPFLNG Satu +1
All posts from katie