Event

Mitigating Uncertainty in Pipeline Inspection with the World's Only Subsea CT Scanner: Discovery™


Learn more Date of Event
13 Feb 2018

As subsea assets age, corrosion issues start to arise and the integrity of those assets are compromised. With the combination of non-intrusive Discovery™ fast scans and extended scans, operators can quickly identify and accurately determine wall loss integrity flaws of both piggable and unpiggable subsea pipelines, all in real time and while online.



This webcast, with case studies, will illustrate how operators can: obtain statistical confidence that their pipeline/pipeline system is within the acceptable tolerance specification, validate ILI inspection/eliminate operational risks associated with ILI usage, eliminate the costs associated with coating removal and ensure that there is no loss to production/deferment of revenue during inspection campaigns.

Register for free today.



New service from OilVoice
Trip Shepherd is for companies who need to track their staff in areas of risk.
It's free to use, so we invite you to try it.

Learn More

https://event.on24.com/wcc/r/1573563/D6AAD2B69DC40...


Date of Event

13 Feb 2018

North SeaGulf Of MexicoArabian GulfSubseapipeline inspectionpipeline integrity

More items from callumgrieves


Tracerco launch Hyperion - an accurate and reliable system for bulk level and density measurements

Tracerco has added to its award-winning range of advanced nucleonic instrumentation by announcing the launch of Hyperion TM . Designed using innovative scintillator based technology, Hyperion TM is a non-contact, no moving parts measurement solution that provides accurate and extremely reliable bu ...

Callum Grieves


Posted 5 months agoPress > Instrumentaioncontrol systemsOil Refinery +2

Decommissioning and the Transportation of NORM and TENORM

Underestimating the time and resource required to correctly transport NORM (Naturally Occurring Radioactive Material) or TENORM (Technologically Enhanced Naturally Occurring Radioactive Material) during decommissioning could prove to be costly, not least because it is likely to cause delays in shipp ...

Callum Grieves


Posted 9 months agoOpinion > Decommissioningoffshore decommissioningTENORM +4

Attend a Lunch and Learn on Tracerco’s Latest Value Added Developments in Pipeline Integrity and Flow Assurance Services

Faster, Safer and Even More Cost Effective: Attend a Lunch and Learn on Tracerco's Latest Value Added Developments in Pipeline Integrity and Flow Assurance Services Village Hotel, Kingswells, Aberdeen AB15 8PJ, Wednesday 6th June, 12:00 - 14:00   Tracerco, in conjunction with Arch ...

Callum Grieves


Aberdeen   Scotland   GB 06 Jun 2018


Posted 1 year agoEvent > North SeaSubseaAberdeen +2

Tying Frac Tracer, Stimulation and Geophysical Data Together

Adding tracers to stimulation fluid has become the industry standard methodology to identify stage production of gas, oil, and water along the length of a wellbore with no well intervention needs. This inexpensive technology provides confirmation that a wellbore is open to flow, identifies and quan ...

Callum Grieves


Posted 1 year agoPress > Reservoir CharacterisationTracer TechnologyShale +5

Decommissioning - To End or Extend?

The challenging conditions faced in today's oil and gas market has increased the focus on cost effective, sustainable operations. Operators are faced with the decision of extending or ending offshore production asset life and pre-decommissioning planning has emerged as a key challenge for the indust ...

Callum Grieves


Posted 1 year agoOpinion > Decommissioningoffshore decommissioningReservoir Characterisation +2
All posts from callumgrieves